Why this matters now

Gaganyaan is tested for: announced PM Modi 15 Aug 2018 Red Fort speech; cabinet approved Dec 2018 (~Rs 9,023 crore); target altitude 400 km LEO, 3 days, 3 astronauts; launcher LVM3 / HRLV (Human Rated Launch Vehicle); Crew Module + Service Module + Crew Escape System; 4 IAF astronauts unveiled 27 Feb 2024 at VSSC by PM Modi: Prashanth Balakrishnan Nair, Angad Pratap, Ajit Krishnan, Shubhanshu Shukla; training Russia + India; TV-D1 Crew Escape Test 21 Oct 2023 SHAR — success; Vyommitra humanoid robot for uncrewed precursor; G1 uncrewed Dec 2024 (revised 2025); G2 + G3 uncrewed; crewed G4 mission 2027; BAS Bharatiya Antariksh Station by 2035; Indian on Moon by 2040.

400 km LEO
3 days, 3 astronauts
LVM3 HRLV
Human-rated
27 Feb 2024
4 IAF astronauts
G4 crewed
Target 2027

Four IAF astronauts

AstronautBackground
Gp Capt Prashanth Balakrishnan NairFrom Kerala. Cat-A flying instructor; Su-30 MKI. Senior astronaut.
Gp Capt Ajit KrishnanFrom Chennai. Cat-A instructor; flight test pilot. Fluent in 6 languages.
Gp Capt Angad PratapFrom Prayagraj. Cat-A instructor; flight test pilot.
Wg Cdr / Gp Capt Shubhanshu ShuklaFrom Lucknow. Combat leader fighter pilot. Selected for ISRO-NASA Axiom-4 ISS mission June 2025 — first Indian on ISS, 2nd Indian in space after Rakesh Sharma 1984.

All four trained at Yuri Gagarin Cosmonaut Training Center (Russia) 2020-21 + Astronaut Training Facility Bengaluru.

TV-D1 Crew Escape Test

21 October 2023, 10:00 IST from SHAR FLP. Test Vehicle Demonstration 1.

  • Single-stage L40-derived TV launched a crew-module mock-up + Crew Escape System (CES).
  • Mid-air abort triggered at Mach 1.2 (~11.7 km altitude).
  • CES separated, parachute deployed, splashdown in Bay of Bengal ~10 km from coast. Recovered by Indian Navy.
  • Initial launch attempt 8:30 IST aborted by engine temperature anomaly; restarted at 10:00 IST.
  • Validated CES function under abort conditions.

Mission roadmap

MissionYearPlan
TV-D1 Crew Escape21 Oct 2023✔ Success
TV-D2 (high-altitude abort)2024-25Planned
G1 (uncrewed orbital)2025With Vyommitra humanoid + dummy crew module
G2 (uncrewed)2026Vyommitra orbital validation.
G3 (uncrewed final)2026-27Last uncrewed.
G4 (crewed)20273 astronauts, 3 days, 400 km LEO.
BAS Bharatiya Antariksh Station20355-module first habitat module by 2028.
Indian on Moon2040Crewed lunar mission.

UPSC angle

Know GAGANYAAN — INDIA’S FIRST CREWED SPACEFLIGHT 3 astronauts 3 days 400 km LEO; PM MODI announced 15 AUG 2018 Red Fort; Cabinet Dec 2018 ~Rs 9023 crore; launcher LVM3 / HRLV Human Rated Launch Vehicle; Crew Module + Service Module + Crew Escape System; 4 IAF ASTRONAUTS UNVEILED 27 FEB 2024 VSSC PM Modi: Gp Capt PRASHANTH BALAKRISHNAN NAIR (Kerala, Su-30) + Gp Capt AJIT KRISHNAN (Chennai 6 languages) + Gp Capt ANGAD PRATAP (Prayagraj) + Wg Cdr/Gp Capt SHUBHANSHU SHUKLA (Lucknow, SELECTED ISRO-NASA AXIOM-4 ISS JUNE 2025 first Indian on ISS, 2nd Indian in space after RAKESH SHARMA 1984 Soyuz T-11); trained YURI GAGARIN COSMONAUT TRAINING CENTER Russia 2020-21 + Astronaut Training Facility Bengaluru; TV-D1 CREW ESCAPE TEST 21 OCT 2023 SHAR FLP single-stage L40-derived; mid-air abort Mach 1.2 ~11.7 km; CES separated + parachute + Bay of Bengal splashdown ~10 km; Initial 8:30 IST aborted engine temp anomaly restarted 10:00 IST; VYOMMITRA HUMANOID ROBOT for uncrewed precursor; G1 uncrewed 2025 + G2 + G3; CREWED G4 MISSION TARGETED 2027; BAS BHARATIYA ANTARIKSH STATION by 2035 first habitat module by 2028; INDIAN ON MOON BY 2040.

Frequently asked questions

When is the first Gaganyaan crewed launch?

Targeted for 2027 (G4 mission). Preceded by uncrewed G1, G2 + G3 missions and TV-D1 (Oct 2023, success) + TV-D2 abort tests.

Who are the Gaganyaan astronauts?

Four IAF officers unveiled by PM Modi on 27 February 2024 at VSSC: Gp Capt Prashanth Balakrishnan Nair (Kerala), Gp Capt Ajit Krishnan (Chennai), Gp Capt Angad Pratap (Prayagraj) + Wg Cdr/Gp Capt Shubhanshu Shukla (Lucknow). Shukla was later selected for the Axiom-4 ISS mission (2025).

What happened in TV-D1?

21 October 2023 at SHAR — a single-stage test vehicle launched a crew-module mock-up. At Mach 1.2 (~11.7 km altitude) the Crew Escape System triggered, separated, deployed parachutes + splashed down in Bay of Bengal. Successfully validated abort.

What comes after Gaganyaan?

Bharatiya Antariksh Station (BAS) — India’s own space station by 2035, with the first habitat module by 2028. Indian on Moon by 2040.